← Assets Home

Knowledge & Happenings

Internal reference for team decisions, active work, notes, and sprint history. Board-accessible.

Decisions
TRANSLATION pivot — rename "creative system" to "translation layer" across all copy
Adopted as the core messaging framework for Phase 2. All critical + high copy changes on get-picasso.com updated accordingly. Showcases and onboarding copy to follow.
Messaging Adopted Mar 2026
P!CA$$0 launch extended to April 14, 2026
Board directive: pushed from end of March to April 14 to allow full TRANSLATION pivot execution across landing page, showcase, and email sequences.
Launch Date Change Mar 31 2026
Netlify deploy: root netlify.toml with base= pattern for subdirectory projects
Established as the deploy pattern for GitHub auto-deploy when site lives in a subfolder. Root netlify.toml points base to waitlist/; subdirectory netlify.toml handles redirects.
DevOps Adopted Mar 2026
Wave 1 Campaign Locked: "Your Translation Era"
Campaign name: Your Translation Era. Tagline: One idea. Every platform's language. Finally you. Lead platforms: Instagram + LinkedIn (supported by TikTok + Newsletter). Signature format: Translation carousel — same brief → 5 platform outputs. Concept approved, execution brief delivered.
Campaign Locked Apr 1 2026
Active Initiatives
P!CA$$0 Launch — transform content engine into growth engine
Target: April 14, 2026. Encompasses landing page copy (TRANSLATION pivot), showcase updates, email drip via Loops, GA4 + Meta Pixel tracking, and full brand asset library.
Launch In Progress Target: Apr 14 2026
Showcase copy updates — context-to-content.com
4 critical + high copy swaps pending on the Replit-hosted showcase. Blocked pending Replit credentials or CMS access. DevOps/MarTech assigned.
Blocked DevOps Apr 2026
Loops drip email sequence — 5-email onboarding series
On-brand HTML email templates built and deployed to Loops. TRANSLATION pivot copy applied. Drip sequence active for new waitlist signups.
MarTech Live Mar 2026
Wave 1 Day 1 Assets — Era Declaration + Founder Post
Era Declaration carousel (Instagram, 5–7 slides) and Founder post visual (LinkedIn) designed and ready. Pending board review Apr 4 before Apr 5 publish.
Campaign Pending Review Deadline: Apr 4 2026
Bug Fixes — Intent Taxonomy + Brand Name (resolved)
Three bugs resolved: (1) Intent taxonomy mismatch — UI showed 9 modes, API executed 6; (2) Brand name "P!CA$$0" absent from authenticated product interior ("Studio Workspace"). All verified closed.
Resolved Engineering Apr 1 2026
Vault Girl
Phase 2 — Build (Active Sprint — Week 1)
Brand direction locked: The Archive
Color system: #0e0c09 (bg), #c4973a (gold accent) · Typography: Georgia italic + Arial small-caps · Aesthetic: Auction-catalog / premium card-selling · Brief approved by CTO
Engineering — completed this sprint
Branch created vault-girl-phase2 created ✓
Codebase audit Feature parity validated ✓
Workspace CWD CEO unblocked ✓
Next.js scaffold App scaffolded in artifacts/vault-girl
DB migration vg_ database schema migration ✓
P0: Image upload Image upload UI added to Item Entry screen ✓
P0: Back link fix Broken back link on Screen 2 fixed ✓
Design — completed this sprint
Designer onboarded Senior UI/UX Designer onboarded — Vault Girl product vision ✓
Brand direction The Archive selected + design brief produced ✓
Team integration
Senior Engineer onboarded · PM sprint rhythm established · CTO sprint review + design→engineering handoff plan approved
Active backlog
Server-side image upload validation (size limit + type allowlist)
Vault Girl Phase 2 Sprint Active Apr 1 2026
Team Notes
context-to-content.com is Replit-hosted (separate from get-picasso.com)
The showcase at context-to-content.com was originally vibe-coded on Replit and is hosted there independently. It is not in the condoonacloud/picasso GitHub repo. Any copy edits require Replit credentials or a CMS handoff.
Infrastructure Mar 31 2026
GA4 (G-X856NEG8V0) and Meta Pixel (507064536607188) live on get-picasso.com
Both tracking scripts are deployed. CSP headers updated to allow external analytics scripts. UTM capture writes to sessionStorage on page load and passes through form submissions.
Analytics Live Mar 2026
Placeholder — PM/Scribe to seed additional notes
This section is ready for team notes: process decisions, design rationale, sprint learnings, key announcements. PM and Scribe will add entries as needed.
Seed
Sprint History
Sprint / Period Focus Key Outcomes Status
Day 4 — night
Apr 1 2026
Vault Girl Phase 2 full sprint: brand direction locked, scaffold done, DB migration done, 2 P0 fixes shipped, full team integrated, CTO handoff approved Brand direction locked (The Archive); Next.js app scaffolded; vg_ DB schema migration done; P0 image upload UI added; P0 back link fixed; Senior Engineer + Senior UI/UX fully integrated; CTO design→engineering handoff plan approved In Progress
Day 4 — evening
Apr 1 2026
Wave 1 campaign locked; Day 1 assets designed; Vault Girl Phase 2 launched; 3 bugs resolved Wave 1 campaign "Your Translation Era" locked; Era Declaration + Founder post designed (Apr 4 review); Vault Girl Phase 2 branch created + audit done; intent taxonomy bug + brand name bug resolved; Mom Vault Girl brief delivered In Progress
Phase 2
Mar–Apr 2026
TRANSLATION pivot — messaging overhaul & growth engine 9 critical/high copy swaps on landing page; Loops drip live; GA4 + Pixel deployed; /assets library published; /knowledge scaffold live In Progress
Phase 1
Early Mar 2026
Foundation — deploy pipeline, brand assets, waitlist Netlify deploy via GitHub; waitlist form + Loops integration; SSH deploy key; OG image + robots/sitemap; email templates scaffolded Complete
Earlier sprints to be seeded by Scribe